155 Bishopsgate is a heavily pedestrianised area of London, which posed significant challenges. The blu-3 team utilised pioneering working methods to ensure a high-quality finished product in a unique space with no disruption to the public and residents.
Location
Spitalfields, London
Client
Overbury on behalf of British Land
Programme
February 2020 -
February 2021
Value
£4,000,000
Project Challenges & Solutions:
- Strict demolition lead times and the project was situated about Liverpool St station,  potentially causing issues with noise and vibrationsÂ
- Waterproofing had to be installed, so to reduce odours from the bituminous material blu-3 installed an extractor fanÂ
- The blu-3 team installed noise barriers to prevent any disturbance for the public and residentsÂ
Scope:
- Soft stripping and demolition before the installation of drainage and waterproofingÂ
- Concrete walls, paving and cladding were installed across the siteÂ
- Street furniture and soft landscaping was installed at the end of the project to add the finishing touchesÂ